LAMPE Sewer Sealing Cushions in London
On March, 20th 2019, we were in London and helped with the installation of our Sewer Sealing Cushions at a pumping station. Among other things, the tensile strength of our new restraints MK3 was successfully tested during this operation. These new restraints hold forces of up to 40 kN each and are designed for particularly challenging applications.
Here is a picture gallery: (Click on the pictures to enlarge)